Project

Solar project at Tata Coffee factory

General information

Year

2022

Wattage

850.5 KWP

Productivity

1,1M KWh

Project detail

Project introduction

OVERVIEW

Solution: Rooftop solar power 

Location: VSIP II Industrial Park – Binh Duong

Investor: Soga Pluto 

PROJECT INFORMATION

Capacity: 850.5 KWP

Number of panels: 1,890

Surveillance technology:  SSOC system.

Electricity Generated:  1,179,000 kWh/year

Reduce CO2: 23,961 tons/year

COD: June, 2022

Project location

Other projects

Project

INSTALLATION OF BESS SYSTEM AT MEGA MARKET SUPERMARKET CAN THO

Year

2026

Wattage

1.044KWH

Productivity

Project

INSTALLATION OF BESS SYSTEM AT COCA-COLA LONG AN FACTORY

Year

2026

Wattage

5.000KWH

Productivity

Project

SOLAR POWER SYSTEM AT VINA CAFE FACTORY

Year

2026

Wattage

999,7 Kwp

Productivity

1,3 Mwh